How the build runs

From layout to handover

01

Design coordination

Drawings are checked against the foundation layout before fabrication starts. Dimensions, bay spacing, and connection details are confirmed in advance.

02

Component transport

Primary frames, secondary framing, and cladding are fabricated and delivered as matched sets, sequenced for the erection order on site.

03

Column alignment

Crews set base plates and erect columns and rafters, checking alignment and plumb at each stage before the frame is locked off.

04

Enclosure and handover

Roof and wall sheeting is fixed to the completed frame, followed by a final check of fixings and sheeting before handover.

On-site installation

Dedicated crews, crane-supported erection

Installation is handled by dedicated assembly crews with crane and rigging support. Frames are set true and checked as they rise, so the structure is square before sheeting begins.

One team carries the work from foundation check to final sheeting, so the supplier who fabricates the frame is also accountable for how it stands.